ARVID NORDQUIST HEADQUARTERS & COFFEE ROASTERY
Järfälla, Stockholm - 2025
CLIENT
Arvid Nordquist HAB, AB Sagax
CONTRACTOR
RO-Gruppen AB
PROJECT MANAGEMENT
AB Byggbesked (developer / AB Sagax), Helenius, Henrik Persson (Arvid Nordquist HAB)
PROCESS EQUIPMENT
Probat Werke, InterSystem, Syntegon, Rovema, among others
SIZE
approx. 17,400 m2
LOCATION
Järfälla Municipality, Stockholm Region, Sweden
CONSTRUCTION – DESIGN DEVELOPMENT STAGE
Rejlers Sverige AB (through Håkan Westerlund), Roberto Crocetti (Wood construction adviser / structural engineer)
TECHNICAL DESIGN TEAM – CONSTRUCTION DOCUMENTS
Rejlers Sverige AB (structural engineering and foundations), Bjerking AB (timber structural engineering and production drawings), UPB (steel and concrete structural engineering and overall frame erection), PO Andersson Konstruktionsbyrå AB (HVAC and plumbing), PE Teknik & Arkitektur AB (sprinkler design), Electro Engineering AB (electrical engineering), Briab Brand & Riskingenjörerna AB (fire engineering), Akustikbyrån AB (acoustic consultancy), Norrlands Trähus AB (timber-framed infill panels), among others
ARCHITECTURAL TEAM
Arvid Jansson (lead architect, project architect), Rolf Eppens (lead architect), Mona Chollet, Johan Nilsson, Jacob Stening, Salomé Martins, Joanna Oleksak, Karin Miedel, Linda Östrand, Jens Persson, Filip Stanik
PHOTOGRAPHY
Anna Kristinsdóttir, Arvid Jansson
The project was developed by Eppens Arkitektur AB, since evolved into ARAK Arkitekter AB.
OVERVIEW
The new headquarters and coffee roastery for Arvid Nordquist brings together industrial production, logistics, offices, laboratories and shared staff facilities in a single 17,400 m² building complex in Järfälla, north of Stockholm.
The project was developed around a simple idea: to give architectural order to an unusually complex industrial programme.
Coffee production determines much of the building. Green coffee arrives at one end of the site, is stored in silos, transported to the roasting hall, ground, packed, palletised and finally moved to storage or dispatch. At the same time, the building accommodates the company’s headquarters, coffee laboratory, production management, training facilities, restaurant and shared spaces. These functions operate at very different scales and with very different technical demands, but were conceived as parts of one organisation.
Timber was established as the principal structural material, with project targets of 90 per cent timber for the headquarters and 70 per cent for the production building. The resulting building combines glulam and CLT with steel and concrete in a series of hybrid structural systems. Subsequent benchmarking has not identified a directly comparable timber-built process-industry facility of greater scale or complexity.
A BUILDING ORGANISED AROUND COFFEE
The roasting hall forms the centre of the project.
In early studies, the roasting hall was placed next to the green-coffee silos, following the most direct sequence of the production process. The possibility of transporting green coffee over longer distances by vacuum allowed this arrangement to be reconsidered. The silos could remain at the eastern edge of the site, while the roasting hall was moved into the centre of the building.
From here, the production flow continues through grinding, packaging and palletising towards the high-bay warehouse and dispatch areas. Around the same centre are the functions most closely connected to the production process: laboratories, coffee purchasing, production management and the roasting control room.
The headquarters and the production offices face one another across a planted roof. Employees enter through the same entrance and use the same principal stair before their routes divide towards offices, laboratories, changing rooms and production. The arrangement was intended to keep headquarters and production closely connected as parts of the same organisation.
BETWEEN STREET AND INFRASTRUCTURE
The organisation of the site responds to two very different edges.
The headquarters is placed along Enköpingsvägen, establishing the public face of the company towards the street. At the opposite side of the site, the largest industrial volumes face the E18 motorway. The high-bay warehouse and production buildings form a large-scale edge towards the infrastructure while also acting as an acoustic barrier for the rest of the complex and nearby residential areas.
Between these two conditions, the building changes continuously in scale: from the relatively compact headquarters to large production halls and the approximately 25-metre-high roasting hall, and finally to the high-bay warehouse. These differences in height and scale are expressed directly in the composition of the complex.
TIMBER AS AN INDUSTRIAL STRUCTURE
Timber was established as the principal structural material, with project targets of 90 per cent timber for the headquarters and 70 per cent for the production building.
The finished building uses a hybrid structural system of glulam, cross-laminated timber, steel and concrete. Different parts of the complex are organised into structural zones according to span, load, fire requirements, vibration, technical installations and production needs. Timber is used wherever its properties are appropriate, while steel and concrete are introduced where the industrial programme requires them.
The large production halls are based on a regular structural module of 7.2 metres with glulam beams and timber roof elements. The roasting hall rises considerably higher and incorporates a heavy process mezzanine carrying industrial equipment and loads of up to 15 kN/m². Here, large steel beams work together with glulam and CLT to form a composite structure.
STRUCTURE & ARCHITECTURE
In the production halls, long glulam beams, timber roof elements and columns remain visible alongside conveyors, pipes, ventilation and process equipment. In the roasting hall, the exposed timber structure forms the spatial framework around the machinery.
The installations remain exposed and form part of the spatial character of the production areas, while the structural system provides an underlying order.
In the headquarters, the same approach is applied at a finer scale.
Here, the structure follows a 3.6-metre module. Glulam columns establish the main rhythm of the building, while a central line of slender steel columns marks the principal circulation route through the office floors. Structure, façade openings and room divisions all follow the same underlying geometry.
In the larger shared spaces, including the restaurant and open-plan offices, the timber structure develops into a ribbed CLT-and-glulam floor system. Ventilation, electrical installations and acoustic treatment are integrated between the ribs, allowing the structural depth to perform several functions at once while leaving the timber visible in the finished interiors.
The cavities between the ribs also form part of the acoustic treatment. A combination of high-level industrial absorbers and suspended acoustic panels creates a deep sound-absorbing zone within the structural depth, particularly important in the open-plan office and restaurant.
A REPRESENTATIVE INDUSTRIAL BUILDING
The building houses both the production facility and the headquarters of a family-owned company with a long history. This dual role influenced the project throughout.
The building had to meet demanding requirements for production, hygiene, logistics, fire safety, vibration control and future technical change. At the same time, it had to represent Arvid Nordquist as a company to employees, visitors, customers and the public.
Views between headquarters and production, shared circulation, a dedicated viewing gallery and the central position of the roasting hall keep the production process visible throughout the building.
The close relationship between production and headquarters makes the factory an everyday presence for employees and visitors, rather than a separate part of the complex.
THE FAÇADE
The difference between production and headquarters is expressed in the building envelope.
The production volumes are clad in light-coloured profiled metal and organised by long horizontal window bands. Their expression is direct and closely related to the scale and repetition of the industrial structure.
The headquarters establishes a different order towards Enköpingsvägen. A limestone plinth forms the base of the building. Above it, the entrance level and three office storeys are articulated by timber-clad pilasters, recessed window bays, horizontal string courses and a pronounced cornice.
The façade is built from prefabricated timber-frame elements, while its architectural order is independent of the joints required by manufacture and assembly.
The primary wall panels establish one layer. Separate prefabricated pilaster elements create continuous vertical divisions across several storeys. Sheet-metal work, mouldings and details form a final layer.
This made it possible to use a highly rational prefabricated construction process without allowing the dimensions of the factory-made panels to determine the final architectural expression.
ONE BUILDING, SEVERAL SCALES
Across the complex, the scale shifts from large production halls and industrial machinery to laboratories, offices, shared spaces and more intimate workplace interiors. The same structural and material principles are carried through these different conditions, although their expression changes with programme and scale.
Clear structural grids, visible construction and a consistent use of materials help establish continuity between the different parts of the building.
The project was developed over seven years in close collaboration with Arvid Nordquist, AB Sagax, process-equipment suppliers and a multidisciplinary engineering team.
The central architectural task was to bring together production processes, technical systems, very different scales and the identity of a long-established family business within one coherent building.